Ikigai Landscaping

Home/Materials/Sod installation…

Materials

Sod installation

Instant lawn on properly prepared grade — and what it needs in the first three weeks.

Preparation

Old material stripped, grade corrected, real topsoil placed and levelled. Sod on compacted builder fill is money spent on something that browns by August.

Installation

Rolled and watered in immediately, seams tight, cut cleanly at edges and beds.

The first three weeks

Serious, daily water. Nearly every sod failure we are called to look at is a watering failure, not a product failure.

Whatever the material, the base under it and the water around it decide how it looks in ten years.

Free estimate

Not sure which material suits the job?

Call or text 647-621-8592 and describe the area.