Nobody publishes prices, which makes it impossible to plan. Here is the shape of it without pretending to quote your property.
What moves the number
Area, access, how much has to come out first, depth of base required, whether grade and drainage need work, and how much saw time the design demands. Material choice matters least of all.
Small scope
A front walkway, a bed rebuild with edging and mulch, a repair and relay of a settled area. Usually days rather than weeks on site.
Mid scope
A rear patio with a seat wall and steps, or a driveway replacement. A week or two, one machine, real excavation and disposal.
Full build
Whole rear yard: grade, drainage, patio, walls, steps, lighting, planting and sod. Two to four weeks, and the stage where phasing across two seasons starts to make sense.
Ask for the quote itemised. It is the only way to see which tier you are actually in and what can be cut.
Read next

The order a backyard gets built — and why it matters
Do these five stages out of order and somebody stands on somebody else's fresh work.
Read
Your new-build backyard is compacted clay. Now what?
What the builder actually left you in Maple or Vaughan, and the order to fix it in.
Read
How to phase a landscape project without wasting money
Splitting a build across two seasons works — if you split it along the right line.